Statement of Competency.Self Assess V/Line Signal Construction Senior Engineer (48564)


Competency requirements

  • Applicants name must be displayed on the uploaded evidence.
  • A V/Line OR *MTM Statement of Competency document is required to be uploaded. 
  • If the 'Apply for Assessment' option was selected: 
    • This document gets uploaded by the assessor when they are passing out the assessment rather than by the contractor / contracting company administrator at the upload and submission stage of the application. 
  • If the assessed SOC was uploaded and submit for approval by the RIW Processing Team, the following points of verification check need to be complete:
    • This competency should not be verified until the relevant SOC endorsement has occurred.
    • To demonstrate endorsement of the SOC, the V/line letter must also be presented (see example).
    • Evidence must be signed by all relevant parties (Applicant and Assessor).
    • Evidence must display matching role title.
    • Black & white OR colour copy of this document is accepted.
    • Must be clear and legible.

Upload requirements 

  • Issue date is to be recorded as the date the assessment was signed off by the applicant.
Accepted evidence
Not accepted evidence
  • No example provided.

Business Rule Link
https://businessrules.riw.net.au/support/solutions/articles/51000078809

Did you find it helpful? Yes No

Send feedback
Sorry we couldn't be helpful. Help us improve this article with your feedback.