Business Rules provide the minimum acceptance criteria for the verification of competence across RIW Program participants.
Business Rules Search
-
- National: ACMA Cabling
- National: A.W Edwards
- National: Certificates and Statements
- National: Drilling
- National: Construction Induction (White Card)
- National: CPB (Pitt Street)
- National: Drivers Licences
- National: E-Learning
- National: Electrical
- National: Environmental
- National: First Aid
- National: High Risk
- National: Information Technology
- National: John Holland Roles
- National: Memberships
- National: Plant and Equipment
- National: Project Management
- National: Safety
- National: Signalling
- National: Surveying
- National: Track Safety Awareness
- National: Trades
- National: Welding
- National: Work Experience
-
- ARTC: ATMS
- ARTC: Engineering and Design
- ARTC: Inductions
- ARTC: Network Control
- ARTC: Phoenix Train Order System (PTOS)
- ARTC: Plant and Equipment
- ARTC: Project
- ARTC: Qualifications
- ARTC: Rule Changes
- ARTC: Safeworking - Briefings and Workshops
- ARTC: Safeworking - NSW
- ARTC: Safeworking - SA
- ARTC: Safeworking - VIC
- ARTC: Signalling
- ARTC: Signals
- ARTC: Structures
- ARTC: Track and Civil
- ARTC: Work Experience
-
- MTM: Authorisation Letters
- MTM: Electrical / Substations
- MTM: Engineering and Design
- MTM: Inductions
- MTM: Metro Contractor Safety Recertification (MCSR)
- MTM: Overhead Safety Observer
- MTM: Permits
- MTM: Project Engineering and Management
- MTM: Qualifications
- MTM: Safeworking
- MTM: Signalling
- MTM: Statement of Attainment
- MTM: Statutory Declaration
- MTM: Track Vehicle Operations
- MTM: Traffic Management
- MTM: Welding
- MTM: Work Experience
- MTM Miscellaneous
- MTM: Structures
-
- QR: Assessor
- QR: Building and Construction
- QR: Communications
- QR: Contracts Management
- QR: Electric Facilities
- QR: Electric Traction
- QR: Electrical
- QR: Emergency Response
- QR: Engineering and Design
- QR: Induction
- QR: Project Management
- QR: Protection Officer
- QR: Rail
- QR: Rail Safety
- QR: Safety
- QR: Security
- QR: Signals
- QR: Stations
- QR: Welder
-
- JHG: Air Conditioning and Refrigeration
- JHG: ARC
- JHG: Asbestos
- JHG: Assessments
- JHG: Assessments - Operator
- JHG: Assessments - Regulator Operator
- JHG: Assessments - Tamper
- JHG: Awareness Training
- JHG: BHP Billiton Track Infrastructure Access
- JHG: Brookfield Rail
- JHG: Canberra Light Rail
- JHG: Confined Spaces
- JHG: Design Infrastructure
- JHG: Drug and Alcohol
- JHG: EDSME
- JHG: Electrical
- JHG: Environmental
- JHG: Fire and Safety
- JHG: Generic Courses
- JHG: Hand Tools
- JHG: Height Safety
- JHG: Hi-Rail
- JHG: Hot Work
- JHG: Human Resources
- JHG: Identification
- JHG: Inductions
- JHG: Isolation and Lockout
- JHG: Locomotive
- JHG: Management, Projects and Engineering
- JHG: Mining
- JHG: Permits
- JHG: Plant and Equipment
- JHG: Power Tools
- JHG: Route Knowledge
- JHG: Roy Hill Safeworking
- JHG: Safety Coordinator
- JHG: Safety Management
- JHG: Self Propelled Equipment
- JHG: Signalling
- JHG: Superintendent
- JHG: Support Services
- JHG: TfNSW
- JHG: Traffic Control
- JHG: VOC
- JHG: Welding
- JHG: Work Experience
MTM: Authorisation Letters
Authorisation Letter.MTM Authorised Signalling Qualifications (66307 / 66307.003 / 67109.002)
Competency requirements Evidence must be one of the following: Applicants name must be displayed Applicants RIW number must be displayed Must be signed and dated by Head of Engineering Signalling as per the template provided.
OR
Letter of Equivalence Applicants name must be displayed on the letter Letter must be issued on Metro Trains Letter head Letter must be dated The letter will have an assessor registration number and is signed and dated by Head of Engineering Signalling as per the template provided. |
Upload requirements
|
Accepted evidence |
Not accepted evidence
|
Business Rule Link https://businessrules.riw.net.au/support/solutions/articles/51000155706 |
Did you find it helpful? Yes No
Send feedbackSorry we couldn't be helpful. Help us improve this article with your feedback.