Safety.QR - Plan & Apply a TA IFP&RTS (81648)


Competency requirements


The QR.Plan & Apply a TA IFP&RTS specifically covers Queensland Rails requirements.


The mentoring logbook is a Queensland Rail internal document used to confirm initial competency as a QNRP transition qualified Protection Officer for being able to Plan & Apply a TA (track authority) IFP&RTS (Infield Protection & Rail Track Signals).


Upload a completed copy of your Mentoring logbook that has evidence of at least one Mentoring event according to the Protection being applied (in this case, Plan & Apply a TA (track authority) IFP&RTS (Infield Protection & Rail Track Signals).

Please Note: Infield protection contains use of rail track signals.

  • The entire row on Page 4 is to be completed in full as per the first (example) row. One row for each event (in line with the competency being submitted) has to be completed.
  • Satisfactory box is required to be checked.
  • The “Protection method” column should specify similar work to the name of the competency and the example as indicated.
  • Page 6 is to show mentor name (under Mentoring record section) and Mentor signature (under Declaration section).

Upload requirements


Upload a completed copy of your Mentoring logbook that has evidence of at least one Mentoring event according to the Protection being applied. In this case, Plan & Apply a TA (track authority) IFP&RTS (Infield Protection & Rail Track Signals).
  • Award date of competency is to be set from the date confirmed in the "declaration" section of page-6 of the logbook.
  • No expiry.
Accepted evidence




Not accepted evidence
  • No example provided.