Business Rules provide the minimum acceptance criteria for the verification of competence across RIW Program participants.
Business Rules Search
-
- National: ACMA Cabling
- National: A.W Edwards
- National: Certificates and Statements
- National: Drilling
- National: Construction Induction (White Card)
- National: CPB (Pitt Street)
- National: Drivers Licences
- National: E-Learning
- National: Electrical
- National: Environmental
- National: First Aid
- National: High Risk
- National: Information Technology
- National: John Holland Roles
- National: Memberships
- National: Plant and Equipment
- National: Project Management
- National: Safety
- National: Signalling
- National: Surveying
- National: Track Safety Awareness
- National: Trades
- National: Welding
- National: Work Experience
-
- ARTC: ATMS
- ARTC: Engineering and Design
- ARTC: Inductions
- ARTC: Network Control
- ARTC: Phoenix Train Order System (PTOS)
- ARTC: Plant and Equipment
- ARTC: Project
- ARTC: Qualifications
- ARTC: Rule Changes
- ARTC: Safeworking - Briefings and Workshops
- ARTC: Safeworking - NSW
- ARTC: Safeworking - SA
- ARTC: Safeworking - VIC
- ARTC: Signalling
- ARTC: Signals
- ARTC: Structures
- ARTC: Track and Civil
- ARTC: Work Experience
-
- MTM: Authorisation Letters
- MTM: Electrical / Substations
- MTM: Engineering and Design
- MTM: Inductions
- MTM: Metro Contractor Safety Recertification (MCSR)
- MTM: Overhead Safety Observer
- MTM: Permits
- MTM: Project Engineering and Management
- MTM: Qualifications
- MTM: Safeworking
- MTM: Signalling
- MTM: Statement of Attainment
- MTM: Statutory Declaration
- MTM: Track Vehicle Operations
- MTM: Traffic Management
- MTM: Welding
- MTM: Work Experience
- MTM Miscellaneous
- MTM: Structures
-
- QR: Assessor
- QR: Building and Construction
- QR: Communications
- QR: Contracts Management
- QR: Electric Facilities
- QR: Electric Traction
- QR: Electrical
- QR: Emergency Response
- QR: Engineering and Design
- QR: Induction
- QR: Project Management
- QR: Protection Officer
- QR: Rail
- QR: Rail Safety
- QR: Safety
- QR: Security
- QR: Signals
- QR: Stations
- QR: Welder
-
- JHG: Air Conditioning and Refrigeration
- JHG: ARC
- JHG: Asbestos
- JHG: Assessments
- JHG: Assessments - Operator
- JHG: Assessments - Regulator Operator
- JHG: Assessments - Tamper
- JHG: Awareness Training
- JHG: BHP Billiton Track Infrastructure Access
- JHG: Brookfield Rail
- JHG: Canberra Light Rail
- JHG: Confined Spaces
- JHG: Design Infrastructure
- JHG: Drug and Alcohol
- JHG: EDSME
- JHG: Electrical
- JHG: Environmental
- JHG: Fire and Safety
- JHG: Generic Courses
- JHG: Hand Tools
- JHG: Height Safety
- JHG: Hi-Rail
- JHG: Hot Work
- JHG: Human Resources
- JHG: Identification
- JHG: Inductions
- JHG: Isolation and Lockout
- JHG: Locomotive
- JHG: Management, Projects and Engineering
- JHG: Mining
- JHG: Permits
- JHG: Plant and Equipment
- JHG: Power Tools
- JHG: Route Knowledge
- JHG: Roy Hill Safeworking
- JHG: Safety Coordinator
- JHG: Safety Management
- JHG: Self Propelled Equipment
- JHG: Signalling
- JHG: Superintendent
- JHG: Support Services
- JHG: TfNSW
- JHG: Traffic Control
- JHG: VOC
- JHG: Welding
- JHG: Work Experience
Job Roles: National Plant Matrix
Job Role: Dump Truck - National
Role Description The role of Dump Truck - National is for dump truck operators who drive large trucks that transport and dump waste materials like sand, gravel, rock or non-degradable garbage. A dump truck is defined as a large truck for transporting heavy loads, with a back part that can be raised at one end so that its contents fall out, wheras a side dump truck (SDT) consists of a 3-axle tractor pulling a 2-axle semi-trailer. It has hydraulic rams which tilt the dump body onto its side, spilling the material to either the left or right side of the trailer. NOTE: These are to be used as a guide only. If you are unsure which role applied to you, please seek clarification from the operator with whom you propose to work as to what role is required for your intended duties. It is the individual's responsibility to ensure that the appropriate role is held before work is carried out. This role is included in the National Plant Matrix. |
Medical Requirement
|
Currency Requirement
|
Competency Requirements Must have at least one of the following:
Must have at least one of the following:
|
Job Role Link:
Did you find it helpful? Yes No
Send feedbackSorry we couldn't be helpful. Help us improve this article with your feedback.